Two concrete pumps pouring foundations
Mitrovica · Kosovo

Concrete that
reaches where
no one else can

A concrete plant with pumps and mixer trucks. We produce, deliver and pour concrete on site — from house foundations to industrial slabs.

0Metres of pumping reach
0Pumps in the fleet
0Concrete classes
75.000m² plant area
What we do

Three services, one phone call

No need to coordinate three suppliers. Concrete, delivery and pumping come from the same team, on the same schedule. ACI is 100% owned by LinProjekt — a construction company with over 35 years of experience.

01

Ready-mix concrete

Produced in the class your project requires, mixed at the plant and checked before dispatch.

  • Classes C16/20 to C40/50
  • Mixes according to EN 206
  • Delivery note for every load
02

Pumping

Three pumps with articulated booms, from 28 to 56 metres. Concrete goes over walls, beyond excavations and up to upper floors without wheelbarrows.

  • Large 56 m pump
  • 36 m and 28 m pumps
  • Specialised operator
03

Delivery by mixer trucks

Mixer trucks keep the concrete moving until the moment of pouring, with coordinated departures so the site never waits.

  • 8 m³ per truck
  • Back-to-back loads
  • Coverage across all of Kosovo
Classes

Which concrete
for which job

The class indicates compressive strength after 28 days, in megapascals. The first number applies to the cylinder test, the second to the cube test.

ClassWhere it is usedStrength
C16/20Light foundations, pavements, sub-base layers
C20/25Slabs, walls, house foundations
C25/30Columns, beams, reinforced concrete structures
C30/37Multi-storey buildings, garages, bridges
C35/45Precast elements, high loads
C40/50Industrial structures with special requirements
Plan the pour

How much concrete you need

Enter the dimensions to get the required volume and the number of mixer trucks. The second tab shows which of the three pumps covers your building. For an exact quote, call us — this is a starting point, not a contract.

The calculation includes a 5% reserve for losses and uneven ground — standard site practice.

17.6m³
Mixer trucks 8 m³3
Area80 m²
Net volume16.0 m³
The fleet at work

Machinery that
keeps to schedule

Pumps and mixer trucks on real sites in Kosovo. When two pumps work in parallel, a large slab is poured without interruption — and without construction joints.

Putzmeister M36 pump and ACI mixer trucks on site
Putzmeister M36 · Mixer trucks lined up
Concrete pump and mixer truck during loading
Loading the pump from the mixer
Concrete pump boom next to the tower crane
Working alongside the tower crane
Foundation pour with two concrete pumps
Foundation pour with two pumps
How we work

From the phone call to the poured slab

01

The order

Tell us the class, quantity and date. If you don't know the class, tell us what you are building.

02

Production

Mixing is done at the plant according to the recipe for the required class.

03

Delivery

Mixer trucks leave in a coordinated sequence so the pour is never interrupted.

04

The pour

The pump places the concrete directly into the formwork, regardless of excavations or height.

Contact

Tell us the date
of the pour

The earlier we know, the better we can plan the mixer schedule. For urgent jobs, call us directly.

SQENDE